Title 24 for Simonton DSM's

of 20

Please download to get full document.

View again

All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
PDF
20 pages
0 downs
17 views
Share
Description
1. Title 24 Windows & Doors Dealer Training 2. 2 3. 3 ã What is Title 24? ã What changes are going into effect? ã How will customers be able to meet…
Transcript
  • 1. Title 24 Windows & Doors Dealer Training
  • 2. 2
  • 3. 3 • What is Title 24? • What changes are going into effect? • How will customers be able to meet requirements? • Prescriptive method • Performance method • How does Title 24 vary from Energy Star? • How will Simonton meet Title 24 requirements • Coastal Zone variances Title 24 Agenda
  • 4. Title 24 is the California Energy Commission’s (CEC) Energy Standards for Residential and Non-residential buildings. For windows, requirements include; • U-Factor performance minimums • SHGC performance minimums • Air Infiltration maximums • Is 100% independent from Energy Star What is Title 24?
  • 5. What is Title 24? To be approved for building permits in the state of California, projects must meet or exceed Title 24 building code requirements. • Title 24 is established as a minimum performance threshold • Jurisdictions can supersede the code/make it more strict
  • 6. 6 Effective July 1, 2014 Requirements For all of CA, except Coastal Zones 1, 3 and 5* U- Factor Air Cfm/sf SHGC * 2014 Code Residential Prescriptive 0.32 ≤.30 0.25 Current Title 24 Prescriptive 0.40 0.40
  • 7. How to meet Title 24 requirements – Prescriptive Method • Most common • Easiest to determine: .32 U-factor, ≤.30 cfm/sf air infiltration, and .25 SHGC (Coastal SHGC requirements for Zones 1, 3 and 5 will differ) – Performance Method • Less common • Several factors involved All CA homeowners replacing windows will be required to meet Title 24 requirements following one of two methods:
  • 8. How to meet Title 24 requirements • Required to follow code exactly, no exceptions • Same U-factor and air infiltration requirements for all 16 California Energy Zones (Zones 1, 3 and 5 SHGC requirements differ) • Simple to follow • Saves time when pulling a permit • Can be used for both residential new construction and replacement windows Prescriptive Method
  • 9. Performance Method Calculation • The performance of the home as a whole is taken into consideration • Requires approximately 2 weeks to receive the needed report, can delay permits • ‘Title 24 Consultants’ utilize software such as “Alternative Calculation Method” to find whether or not the home meets requirements and provide wiggle room for products not meeting the prescriptive method • Average costs of testing is $200-300 How to meet Title 24 requirements
  • 10. 10
  • 11. Energy Star® vs. Title 24 11 South Central South Central North Central Energy Star Climate Zones
  • 12. What does this mean for Simonton & You?
  • 13. Simonton & Title 24 Simonton will make it simple to meet the prescriptive Title 24 requirements by offering the “Title 24 Glass Package,” available in EPOPS. 13
  • 14. Simonton & Title 24 14 Prescriptive: U Value ≤ .32 SHGC ≤ .25 Product Series Style (w/o grids) Glass Gas Spacer U SHGC no grids/grids Meets Base - ProSolar Argon Intercept 0.30 0.31 No T24 - ProSolar Shade Argon Intercept 0.29 0.22/0.20 Yes Base - ProSolar Argon Intercept 0.27 0.32 No T24 - ProSolar Shade Argon Intercept 0.26 0.23/0.21 Yes Base - ProSolar Argon Intercept 0.29 0.30 No T24 - ProSolar Shade Argon Intercept 0.29 0.22/0.20 Yes Base - ProSolar Argon Intercept 0.27 0.22 Yes T24 - ProSolar Shade Argon Intercept 0.27 0.11/0.16 Yes SH 3050 D'Max PW 4040 SL 5030 CS 3040
  • 15. Simonton & Title 24 15 Prescriptive: U Value ≤ .32 SHGC ≤ .25 Product Series Style (w/o grids) Glass Gas Spacer U SHGC no grids/grids Meets Base - ProSolar Argon Intercept 0.29 0.29 No T24 - ProSolar Shade Argon Intercept 0.29 0.21/0.19 Yes Base - ProSolar Argon Intercept 0.30 0.28 No T24 - ProSolar Shade Argon Intercept 0.29 0.20/0.18 Yes Base - ProSolar Argon Intercept 0.30 0.29 No T24 - ProSolar Shade Argon Intercept 0.29 0.20/0.18 Yes Base - ProSolar Argon Intercept 0.28 0.30 No T24 - ProSolar Shade Argon Intercept 0.28 0.22/0.19 Yes Madeira SL 5030 DH 3050 SH 3050 PW 4040
  • 16. Simonton & Title 24 16 Prescriptive: U Value ≤ .32 SHGC ≤ .25 Product Series Style (w/o grids) Glass Gas Spacer U SHGC no grids/grids Meets ProSolar (Std) Argon Intercept 0.32 0.25 + No T24 - ProSolar Shade Argon Intercept 0.31 0.18/0.16 Yes ProSolar (Std) Argon Intercept 0.32 0.25 + No T24 - ProSolar Shade Argon Intercept 0.29 0.21/0.19 Yes Lumera 2, 3, 4 -Lite ProSolar (Std) Argon Intercept 0.32 0.18/0.15 Yes French Rail PD Contemporary PD 2, 3, 4 -Lite 2, 3, 4 -Lite
  • 17. Simonton & Title 24 17 Prescriptive: U Value ≤ .32 SHGC ≤ .25 Product Series Style (w/o grids) Glass Gas Spacer U SHGC no grids/grids Meets Clear Air Intercept 0.48 0.63 NO ProSolar Argon Intercept 0.31 0.30 NO ProSolar Shade Argon Supercept 0.31 0.22/0.19 Yes Clear Air Intercept 0.48 0.63 NO ProSolar Argon Intercept 0.30 0.30 NO ProSolar Shade Argon Supercept 0.30 0.22/0.19 Yes Clear Air Intercept 0.47 0.70 NO ProSolar Argon Intercept 0.27 0.33 NO ProSolar Shade Argon Supercept 0.28 0.24/0.22 Yes Clear Air Intercept 0.48 0.63 NO ProSolar Argon Intercept 0.31 0.30 NO ProSolar Shade Argon Supercept 0.29 0.24/0.22 Yes Clear Air Intercept 0.48 0.63 NO ProSolar Argon Intercept 0.30 0.30 NO ProSolar Shade Argon Supercept 0.29 0.22/0.19 Yes SH-PC-SH 7050 Verona PC over SL 5050 SL 5030 SH 3050 PW 4040
  • 18. 18 Simonton Windows, Inc. has made every effort to provide products which will help our customers meet the code requirements. In order to ensure that your project will meet all applicable codes, please consult your local design professional or code enforcement official.
  • 19. Title 24 Coastal variations 19 • U-Factor requirements are the same for all of CA • There are NO SHGC requirements for Coastal regions 1, 3 and 5
  • 20. Summary 20 • Simonton currently has glass packages which will comply with Title 24 requirements for seamless transition • Homeowners replacing windows will have to meet Title 24 requirements via Prescriptive or Performance methods • Prescriptive requirements are ≤.32 U-factor, .30 cfm/sf air infiltration and ≤.25 SHGC for all areas other than Coastal regions 1, 3 and 5 • Coastal requirements for zones 1, 3 and 5 have no SHCG Title 24 min/max • Utilize a “Title 24 Consultant” if using the Performance Method to ensure compliance • When in doubt, contact your Simonton Representative
  • Related Search
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks